Mode:  
Code Red


Now available in Perrysburg.

Click here to learn more.

ALERTS

2/2/2010 3:49:16 PM
CSX Railroad Crossing Supplemental Safety Measures

Pursuant to an agreement between CSX Railroad, the Ohio Rail Development Commission, the Public Utilities Commission of Ohio and the City of Perrysburg, a project to install new warning gates and lights at the CSX crossing on Walnut, Locust and Elm Streets will be completed during the spring of 2010.  The CSX crossings at Pine, Cherry and Hickory Streets will be permanently closed within sixty (60) days of the installation of the new lights and gates at the other crossings. 

Read More..

2/25/2010 1:35:30 PM
There is a special HSPU meeting on March 2 at 6:45 pm. The Regular March HSPU meeting will be held on March 23 at 6:00 pm.
Read More..

3/9/2010 9:41:26 AM
The City Compost Site is open Saturday March 13 from 8 am - 12 noon. The Site is available to city residents.
Read More..


City Departments > Engineering

Engineering

Engineering
City Engineer: Douglas L. Dariano, P.E.
Engineering Tech: Michael Johnson
201 W. Indiana Ave.
Perrysburg, OH 43551
P: 419-872-7880
F: 419.872.8019
E: ddariano@ci.perrysburg.oh.us & mjohnson@ci.perrysburg.oh.us

Hours: 8:00 a.m. to 4:30 p.m., Monday through Friday

 

Engineering Year End Report

 TitleCategoryModified DateSize 
Engineering Year End Report 2/25/20094.87 MBDownload